AUG Pharma

AUG Pharma is consists of 4 Buildings with total built-up area 12,500 m

MEP Contracting Scope : 
•Water Cooled Absorption Chillers operated by natural gas and having a capcity of 2*300 T.R. to cool a water flow rate of 720 GPM from 54.00F to 44.0°F.
•Electrical Power System of 1 x 1,600 KVA Transformers.
•1500 rpm, 380/220 V, 50 Hz. 3 phase, 4 wires and 1.5 MVA (Diesel Generatinq unit).
•Light Current System including, Telephone ,Data, Fire Alarm, Public Address , Access Control & CCTV systems.
•Plumbing & Drainage system.
•Fire Fighting System. •Clean Areas Validation.
•Pharmaceutical production process cooling and heating

Building Automation System Scope : 
Building Management System (BMS) for HVAC:
1. Chilled water system • (2) chillers • (3) Primary pumps • (5) Secondary pumps
2. Cooling Water System • (2) Cooling towers • (3) Primary pumps
3. Hot Water System • (2) Heat Exchangers • (2) Primary pumps
4. Air distribution • (32) AHUs • (67) FCUs • (25) Exhaust Fans • (15) Fresh Air Fans
5. Controlling and monitoring for Pressure, Temperature and RH. • (120) Zones